xecution & Erection
Pre Curving and assembly of Sheets are done at Site.
The process allows High Speed Erection of Roofing Sheets giving installation speed of around 1500 sq. m. in 12 hrs.
After Erection, it is bolted with the supporting structure by Self Splitting screws or Nuts & Bolts.
The Pre Curved K Span Sheet, after launching is fixed at the supporting structure or eave with self-splitting High Tensile Screws or Nuts & Bolts.
In case of single span, side/End Support with gutters for collection and disposal of rainwater is needed.
In case of multiple spans the center support with gutter is required.
These supports with gutters can be RCC or Steel.